Laserfiche WebLink
1321.03 PLUMBING AND SEWER PERMIT FEES. <br />The following fee schedule shall prevail for all plumbing and sewer work to be performed. <br />(a) This base fee for any plumbing or sewer permit on a new construction and/or <br />4(4 <br />)Over�nn <br />(b:A) Residential, new construction, additions, or alterations <br />1 addition, alterations, to which shall be added the following charges for each unit <br />(1) Base fee, plus:'. <br />50.00_ <br />�'. <br />installed or altered: <br />_ <br />3.00 <br />(3) Outlets over 200 volts, panels, disconnects, and meter bases, each <br />_ <br />_(1) Residential <br />4990 50.00 <br />(2) Commercial <br />60.00 75.00 <br />(b)Each <br />12.00 <br />Over I IIP, up to 15 ❑1' <br />Sum PumeorEjector _-_ <br />(c) P P 1 <br />Over 15 HP <br />1400_ <br />5.00 <br />O_—_ 6 _.. _ <br />d Water Heater or Storage Tank <br />-- - <br />- <br />10.00 <br />_ <br />(e) Each 100 Lineal Feet or Fraction thereof Building Drain or Sewer <br />_ <br />(2) Per outlet and switches <br />10.00__ <br />(f) Oil Separator <br />50.00 <br />21 00 _ <br />(g) Sewage Ejector <br />' 12.00_ <br />(h) Lawn Sprinkler System <br />_ <br />30.00 <br />(i) Catch Basin <br />8.00 <br />O Interceptor (grease) 1,000 gallons <br />_ 60.00 <br />(k) Grease Trap_ <br />30.00 <br />I Air Admittance Valve, each <br />10.00 <br />1321.04 ELECTRICAL PERMIT FEES. <br />The following fee schedule shall prevail for all electrical work to be performed <br />4(4 <br />)Over�nn <br />(b:A) Residential, new construction, additions, or alterations <br />(1) Base fee, plus:'. <br />50.00_ <br />�'. <br />(2) Per outlet and switches - <br />_ <br />3.00 <br />(3) Outlets over 200 volts, panels, disconnects, and meter bases, each <br />10.00 <br />(4) Power outlets: transformers, generators, batteries (prime and second), <br />rectifiers, electrostatic filters and motors, including controls, distribution <br />and connections thereto, each: <br />Up to 1 HP <br />12.00 <br />Over I IIP, up to 15 ❑1' <br />25.00 <br />Over 15 HP <br />35.00 <br />e�) Commercial or industrial, new construction or addition _ <br />(1) Base fee, plus: <br />75.00 <br />_ <br />(2) Per outlet and switches <br />2.50 <br />_ _ <br />Parking lot light fixtures (per pole) - - <br />50.00 <br />_(3) <br />(4) Outlets over 200 volts, panels, disconnects, and meter bases, each <br />15.00 <br />(5) Power outlets: transformers, generators, batteries (prime and second), <br />rectifiers, electrostatic filters and motors, including controls, distribution <br />and connections thereto. each: <br />Up to 1 HP <br />12.00 <br />Over 11 IP, up to 15 1111 <br />25.00 <br />Over 15 HP <br />35.00 <br />(6) X-ray machine and equipment, each <br />45.00 <br />(7) Fire alarm control panel. initialing, and annunciating device, each <br />2.50 <br />