Laserfiche WebLink
Harrington Electric Co. <br />Clarifications <br />• Price includes on-line drawing and engineering review for compliance, functionality, <br />and inspection. <br />• Price includes all over current devices, grounding electrodes/ conductors, serviceable <br />bypass functionality, and MOPs (methods of procedure) for both the installation and <br />use of the newly installed system. <br />• Price includes UPS startup commissioning and all procedures necessary to perform <br />load migrations with minimal facility impact. <br />• All device, panels, transformer, and UPS placements will be reviewed and approved <br />prior to performing work. <br />• All through penetrations will meet or exceed existing conditions, or as directed by <br />building and facility management. <br />• Upon approval of the design/ build proposal, load recordings and generator <br />functionality tests will be performed to validate both the UPS KVA, and the <br />anticipated in -use load migrations <br />• Specifications and hardware submittals (UPS, transformer, distribution, panelboards) <br />will be released prior to the submission of the design drawing. <br />• Price excludes any "normal' power migrations from generated source panels to the <br />newly installed "normal' primary distribution that may be deemed unnecessary for <br />facility functionality. (various lighting, kitchen, various ac) <br />• All work to be performed during normal business hours. <br />Ekdricpl<auhuction�VNce/OatNVAeo�Oesign/BuiM �24�ourServire.Lamp oMftfzf Re,d i, <br />Ml eonbsclor Llwrue No. 11951 <br />