My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-017 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2025
>
2025-017 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2025 2:54:52 PM
Creation date
9/8/2025 1:26:28 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2025-017
Legislation Date
9/2/2025
Year
2025
Legislation Title
2025 Comprehensive Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Chaoter 8 Infrastructure. Utilities & Innovation/Technologv Stratem' To utilize the most innovative technology to retrofit our infrastructure and utilities as funding allows, ensuring <br />that all residents and businesses have equitable <br />access to safe, affordable, and sustainable infrastructure. The upgraded infrastructure will be the backbone of a thriving, resilient, and inclusive <br />s community. <br />,x <br />8.1 Infrastructure, Utilities & InnovatfonjTechnology Goal: Effectively manage and treat stormwater runoff to prevent flooding, reduce pollution, protect other infrastructure (roads, sidewalks, <br />parking lots), and enhance environmental <br />sustainability. <br />Action Item <br />Location/Attributes Time Frame <br />Potential <br />Responsiblei <br />Party <br />Potential <br />Funding <br />8.1a Review and revise minimum <br />-City-wide Short Term <br />ECDD <br />N/A <br />parking standards in the city, as <br />-Utilize maximum parking standards to discourage overparking <br />CEng <br />hardscaped surfaces result in more <br />stormwater runoff. <br />-Work with property owners to explore reductions in existing parking surfaces <br />Dev <br />-Land banked parking or reserved land for future parking needs without immediately building <br />BPO <br />the parking infrastructure <br />*8.1b Increase the use of permeable <br />-City-wide Short -Mid <br />CEng <br />N/A j <br />surfaces. Use green infrastructure to <br />_Permeable surfaces like permeable pavement, rainwater harvesting, and green roors to either Term <br />Dev <br />{ <br />filter and treat stormwater naturally. <br />capture and reuse stormwater; absorb rainfall, or reduce runoff <br />BPO <br />-Green infrastructure like rain gardens, bioswales, and constructed wetlands <br />-Reduce impervious land in the city by S% over the next ten years_ <br />8.1e Create a stormwater management <br />-City-wide Short Term <br />CEng <br />NEORSD <br />incentive program. <br />-Financial incentives, technical assistance, regulatory incentives, public education/outreach, and <br />ECDD <br />Project Clean Lake Green <br />public/private partnerships and collaboration <br />S <br />Infrastructure Grants <br />FD <br />Stormwater Rebates/ <br />Credits <br />
The URL can be used to link to this page
Your browser does not support the video tag.