My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-017 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2025
>
2025-017 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2025 2:54:52 PM
Creation date
9/8/2025 1:26:28 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2025-017
Legislation Date
9/2/2025
Year
2025
Legislation Title
2025 Comprehensive Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.2 Infrastructure, Utilities & InnovationlTechnology Goal, Prioritize road pavement improvements (repair and replacement) within the city, with an initial focus on primary arterial roads, <br />through a comprehensive road capital improvement plan. Examine dangerous intersections for correction and realignment needs. <br />*8.2a Repave Lorain Road and <br />-Lorain Road <br />Short -Mid <br />CEng <br />OPWC SCIP <br />implement the recommendations from <br />-Secondary priority for paving is arterial roads <br />Term <br />S <br />ODOT <br />the 2023 Corridor Study. <br />-improved pavement for extended road lifespan, improved safety, enhanced accessibility, and <br />cc <br />STBG <br />lower vehicle maintenance costs <br />LTIP <br />8.2b Develop a streetscape maintenance, <br />Lorain Road, Brookpark Road <br />Short Term <br />CEng <br />Tit <br />plan. <br />Addresses green zone improvements, watering, and annual maintenance to balance and <br />S <br />BID/SID <br />support pavement upgrades <br />*8.2c Improve Lorain Road and <br />-intersection of Lorain and Columbia Roads <br />Short Term <br />CEng <br />HSIP <br />Columbia Road intersection for safety <br />-Safer intersection <br />SRTS <br />in anticipation of the new Elementary <br />i <br />STBG <br />School. <br />8.2d Develop a pavement marking kcity-wide <br />maintenance plan. tl[Ensure crosswalks and other safety markings are visible <br />8.2 e Implement a "dig once" strategy for <br />I -City-wide <br />infrastructure improvements, utilizing J -Aligning storm and sewer projects with road projects <br />the 5-year capital plan model. <br />NEW <br />F <br />TAP <br />OPWC <br />Short Term CEng <br />N/A <br />S <br />Short -Long CEng <br />N/A <br />Term DH <br />S <br />cc <br />
The URL can be used to link to this page
Your browser does not support the video tag.