My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1963 825 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1961-1964 Ordinances
>
1963 825 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:52:57 PM
Creation date
8/7/2018 6:20:10 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
825
Date
12/16/1963
Year
1963
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sec. lj C?3LOi~,IId~-1TION: <br />(a) G"JDIE1Z.t~L: Following preliminary flushing, the newly laid <br />Urater pipe shall be chlorinated. The processes of chlorinating, the <br />method of procedure, the chlorinating agent, and the rate of applica- <br />tion shall be deterrnined by the Division of ~:;ater of the City of <br />Cleveland. The Contractor shall pay to the Division of ?{ater of the <br />City of .Cleveland for ch1_orination or sampling of the vra~ter at the rate <br />of five cents (5¢) per linear foot for the first thousand feet, and <br />three cents (3¢) per foot thereafter of the water maa..n proper, with a <br />minimum charge of twenty-five dollars (;25.00). The Contractor shall <br />furnish the necessary labor for excavating and backfilling which will <br />be required for the installation of taps for injecting the chlorine <br />solution, operating: pumps and flushing mains. <br />(b) .FII~Ti~L r'LUSHING Ati-D T?C$T : Folloving chlorinat_i_ on, all treated <br />water shall be thoroughly flushed from the newly l.a:~_c~. pipe at i.ts <br />extremities until the replacement vrater tk::rougho~zt i:,s length sn~.ll, <br />upon test, both chemically and bacteriolog~:ical.ly, ~.,~ I:.'~oven equal to the <br />Vrater quality served the public from the e_:istin~; wr~:Le~^ supply system. <br />All costs for chloration and flushing of. mains sh:;i 1 be at the exp~ns e <br />of the Contractor. <br />Sec . 16 CURS COI~II~?ECTIQIVS <br />(a) GEiVE17AL: In such locations as may be indicated by Engineer <br />the Contractor shall excavate f'or House conreot:i_ort bettiveen the seater <br />main and a point three feet (3 ~) be;,~ond curb line. The connection shall <br />be standard extra heavy lead pipe o.r copper pipe conforming ire all re- <br />specL-s to the specifications and requirerents of the Division of '~,ater <br />and of the size inclieated on plan or bid b1_anlc. <br />(b) T.~I'rING: `Phe Contractor shall arrange l~ritlz the Division of <br />~:;ater of the City of Cleveland to make the pressure tey~s install the .. <br />corporation cock and furnish any other material ~^rhich tie Division <br />elects ~ to supply. .The connection shall be blocked up vrith stone, bricl. <br />or concrete to insure a firm support for said coupling and resist ah_ <br />set-tlernents in backfilling. 7.'he blocking shall be Held firmly in pla~.e <br />by fine dry earth firmly tamped around it. ;Aiere excavation is in wild., <br />clay or .light earth the yvater curb connection must be laid in a trench <br />separate from any sevrer lines. In rock or shale the :eater curb connec- <br />tion may be laid in the same trench vrliicii contains the sevrer pipe pro- <br />viclin~; ~tht: trench is of sufficient 4viclth and an eight inch (8~~) shelf <br />is provided on which to lay the connection. At the curb end of the <br />connection a shut off valve shall be connected, mounted on a blocking of <br />stone, brick or concrete to. resist settlement and vrith the curb box <br />mounted and maintained plumb osier the gate valve nut, with the top of <br />box at the finished grade of lativn space. The price bid shal_1_ include <br />all costs charged by Division of TTater, City of Cleveland. <br />Sec. 17 BiiClff ILLING: <br />(a) EXTI1JNT OF bACIu ILL: The backfill_ includes ail. ba.cl~'illing, <br />ramming, puddling or rolling, as required, the regrading o~ ~:.:'•.,~~cent <br />disturbed areas, the replacing of dx•ains and. other surface ana sub- <br />surface structures, the placing and ntainl{aining of suitable temporary <br />- 12 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.