Laserfiche WebLink
<br />PRASE I - PROGRAM FOR CREATION AMID OPERATION OF A <br />SZ~DRI~iATER NIl9IT LiTILITY <br />TASK A - REVIEW CURRII~IT STORMWAT~R OPERATIONS <br />A.1 Evaluate Existing Levels of Service <br />Based on interviews with Village staff and officials existing level of <br />service procedures will be reviewed. Historical maintenance activities <br />and complaint filing and response procedures will be evaluated. <br />A.2 Define Existing Organizational Structure <br />The existing Village organizational structure must be considered in <br />selecting the organizational/management alternatives for addressing <br />storm drainage problems and protecting against future problems caused <br />by land develo~enent. The complete organizational structure of the <br />Village will be reviewed. <br />A.3 Review Village Operating Budgets <br />Current and available historical <br />Specific line item expenditures <br />typically as follows: <br />Village budgets will be reviewed. <br />for stormwater will be evaluated <br />' Capital Improvement Projects <br />' Maintenance Costs <br />' Administrative Costs <br />' Planning Costs <br />' Emergency Response <br />' Operational Costs <br />' Regulatory/Miscellaneous Costs <br />TASK B - REVEIEW CURRF~I'P STORM~+II~iTIIt PROSI~S <br />B.1 Evaluate Existing Studies <br />Existing studies, reports, and historical data regarding stormwater <br />and drainage issues will be obtained and reviewed for their <br />information, results, and recommendations. This information will be <br />integrated into the development of levels of service, operation and <br />maintenance procedures, and capital improvement needs in order to <br />perform rate allocation analyses. <br />B.2 Identify Additional Analysis of Drainage System <br />Based on discussions with Village officials determine the need an <br />preliminary scope of additional system analysis to be performed to <br />determine both structural and non-structural solutions to existing <br />problems. <br />