My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/20/1994 Meeting Minutes
DOcument-Host
>
Mayfield Village
>
Meeting Minutes
>
1994
>
06/20/1994 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:12:11 AM
Creation date
7/18/2018 8:52:57 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
6/20/1994
Year
1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
168 <br />Regular Council Meeting <br />6/20/94 <br />Page Eight <br />questioned the barn at 475 S.O.M. Center Road being used for vehicle repairs. The case <br />is scheduled for next Thursday at which time they will ask for the barn to be razed. <br />They recommend the plan (Ordinance No. 93-19) as presented be rejected. They <br />discussed Ordinance No. 94-21. Recreation Board - Mr. Stephens said the Board met June 15. They had a lengthy <br />discussion on financial operations. The Board feels a critical issue related to the <br />children running back and forth across the street to the playground area--speed bumps <br />were suggested. <br />Mayor Rinker said on a pilot basis, we will install an additional guard to regulate <br />pedestrian and vehicular traffic in that area. We will see how that works out. His <br />suggestion to Recreation is that be a fee that would be spread out and borne by all <br />participants. Speed bumps will not be feasible because it would wreak havoc on our <br />service vehicles. Mayor Rinker said we are putting up a fence along the third base line <br />and will be sprucing up the entire area. <br />Upper 40 - Mr. Cappello said on June 10, they sent the Wetlands Study to the Army <br />Corps of Engineers. On June 14, the preliminary design report was sent to ODNR. We <br />plan to advertise for bids this Thursday. <br />Highland/SOM - Since there was discussion regarding this topic earlier during the <br />meeting, there was no discussion at this time. <br />Beech Hill - Mr. Cappello said the sewer (the actual laying of the sewer) should be <br />completed in approximately two weeks. There is a manhole that needs to be built in the <br />intersection. Those manholes usually take a while because they are cast in place. <br />I-271- Mr. Hovancsek said he contacted O.D.O.T., talked to Eric Forsberg, Denny <br />Knaus and to the design person. They will be getting him some additional data on the <br />detention area for the zone north of Highland Road. They are working up the data for <br />the detention area south of Wilson Mills. <br />Mrs. Cinco said, for the record, when do we look to see sound barriers <br />Mr. Hovancsek said there is no contract to design sound barriers because O.D.O.T. is <br />broke until after July. O.D.O.T. will sign a contract with a consultant--he believes it is <br />Central Engineering--they will start work after July. They should have the plans done <br />by the early part of 1995 and there should be construction sometime in 1995.
The URL can be used to link to this page
Your browser does not support the video tag.