My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/21/1993 Meeting Minutes
DOcument-Host
>
Mayfield Village
>
Meeting Minutes
>
1993
>
06/21/1993 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:12:29 AM
Creation date
7/18/2018 9:32:25 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
6/21/1993
Year
1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Regular Council Meeting <br />6/21/93 <br />Page Twelve <br />ROLL CALL: AYES: None <br />NAYS: All <br />Motion Not Carried <br />Bids Rejected <br />• Selection of Appraiser for Evaluation of Whitehaven and Upper 40 <br />Sites for Projected Detention Basin - Mayor Rinker said the Village has <br />received substantial funding to do this project in conjunction with the Metroparks. <br />They had hoped to be able to do this on the property of Village residents; the residents <br />think that the Whitehaven Cemetery property should be considered. This was part of <br />the URS study. We must get information as to the competing property owners' <br />interests. Council does not need a motion. <br />• Computer Equipment for Service Dept. -$4,500 - Mr. Ferrante, seconded by Mrs. <br />Leppla, made a motion to authorize an expenditure not to exceed $4,500 for the <br />purchase of computer equipment for the Service Department. <br />ROLL CALL: AYES: All <br />NAYS: None <br />Motion Carried <br />Expenditure Authorized <br />, <br /> <br />• Walnut/Thornapple Drainage - Motion to Approve an Expenditure <br />of Approximatelv $7,000 ($4,000 labor; $3,000 pipe) - Mr. Lou Hovancsek said <br />on two occasions they visited the site and evaluated the problems. There is a total of 13 <br />affected properties. <br />Mr. Lou Hovancsek said Village employees will provide the labor will be needed to <br />place the pipe at the easterly end and to clean and deepen the ditch. The balance of the <br />work will be done by the contractor. The approximate cost of the pipe is $2,000. <br />Mr. (Steve) Hovancsek said the pipe to be used is a heavy duty plastic pipe (STR 35) so <br />tree roots will not disrupt the sewer system. <br />Mr. Fixler said he thinks a lot of these problems are coming from neglect over the years. <br />He is concerned about the maintenance; he does not want to spend tax dollars then have <br />to go back in (to do additional maintenance) in 5-10 years. <br />Mr. Hovancsek said once the swale is established, the responsibility rests with the home <br />owner; the only tiine the Village gets involved is when it does not flow. <br />
The URL can be used to link to this page
Your browser does not support the video tag.