My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/13/1989 Meeting Minutes
DOcument-Host
>
Mayfield Village
>
Meeting Minutes
>
1989
>
07/13/1989 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:15:19 AM
Creation date
7/23/2018 5:44:24 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
7/13/1989
Year
1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Special Council Meeting <br />7/13/89 <br />Page 3 <br />Mr. Pietrafese said he feels it isn't done all at one time that it will <br />not be done. <br />Mr. Rinker said that everything we have done has been in stages. <br />Mrs. Mills said the problem is that we do not have the bids to go <br />further than what we had planned to. <br />Mr. Pietrafese ask why bids were only taken for 4-5 properties and not <br />the whole thing. <br />Mrs. Mills said that Burgess and Niple had given us an estimate of <br />$110-120,000 + to to this section. <br />Mr. Pietrafese said he wants them to do the upper end. <br />A gentleman in the audience asked why not the whole thing. He said a <br />plan should've been made for the whole thing and then do it in <br />sections. <br />Mr. Rinker said that the Village hired Burgess and Niple to go through <br />the entire Village. They have prepared a comprehensive report and we <br />are trying to follow their list_of priorities. He said we are trying <br />to address the worst part of the problem. <br />Mr. Pietrafese said they were told at their March 27 meeting that the <br />propoosal was for the whole thing. He said they were not ever told <br />that it was just for four lots. <br />Mrs. Finke, 6868 Creekwood Lane, said that Burgess and Niple were using <br />the original plans that Mr. Courtney was using 5 years ago. <br />Mr. Pietrafese asked why we'd be doing only 4 or 5 lots when they were <br />told the whole thing would be done. He said that no one was informed <br />about this meeting. <br />A gentleman in the audience asked who prepared the drawings. <br />Mr. Wolszynek said that the drawing was taken from Courtney's drawing. <br />They did not do the design. He said it includes the design done by Lee <br />Courtney in 1984. They have updated it. They have shot grades after <br />the rains, etc. The plans show an amount of earth to be moved. <br />Someone in the audience asked why we can't get the rest of the design <br />done. Why can't the city find out what what the cost of the design is. <br />Is it possible they could know what that budget is. Or if the design <br />could be completed, could the contractor be given the o.k. to go ahead. <br />Mr. Pietrafese said why only consider 4 or 5 lots. He said he was told <br />that Burgess and Niple would come up with a proposal to do the whole <br />creek.
The URL can be used to link to this page
Your browser does not support the video tag.