Laserfiche WebLink
Minutes of the Regular Meeting of Council , <br />Monday, July 16, 2012 <br />Page 3 <br />work including streetscapes and landscape design as well. It's very, focused on outdoor <br />environments, outside of buildings and in conjunction with engineers. Tom will attest to this that <br />engineers often deal with underground utilities and grading and infrastructure. We work in <br />conjunction with engineers to actually make things look as presentable and aesthetically pleasing <br />as possible in the outdoor environment. <br />Mr. McKnight presented a powerpoint. Some of the recent projects that our office has been <br />involved in is the redevelopment of Ghester Commons downtown. It's now known as Perk Plaza. <br />This is at East 12t` and Chester. It's a$3,000,000 park that was just completed in December of <br />2011. It's a dynamic park space in the downtown Cleveland environment. We worked in <br />conjunction with a Landscape Architect in New York City. He did the actual design and a lot of <br />the sketch work. Our office actually did the construction plans and oversaw the construction of <br />the park. The features are the trails that you see in the lower left picture and then substantial <br />greenspace for the residential environmenf there along East 12'h around Chester. <br />We are just now this week finishing up a zoned recreation site which is a 22-acre park on the <br />west side of Cleveland at West 650' and Lorain. It involves some active recreation fields. <br />There's two baseball fields, two soccer fields and then a quite extensive system of parks, <br />playgrounds, a sprayground, a small skateboard area as well as a fitness area for seniors. There's <br />also a dog park on that side. <br />We were involved extensively with planning along the Rockefeller Park corridor about three <br />years ago. This led then to what would be the redevelopment. Essentially we feel like we are <br />fixing the parkway where Martin Luther King, Jr. Parkway comes through at 105'h Street. <br />There's currently what we call suicide circle. We are eliminating that circle and clearing up the <br />transportation and path system through that intersection near the Cancer Survivor's Monutnent. <br />The image at the top is a series of bridges that will go through the park and link the park from <br />Wade Park and Wade Ova1 over to what Case is calling their West Campus on the west side of <br />East lOSth Street. That will go under consiruction in the next three months with anticipated <br />completion in 2014. <br />On a much smaller scale, we completed a park for Stephanie Tubbs Jones. This is her sculpture. <br />This is near the VA. This is also adjacent to Wade Oval and the University Circle azea of <br />Cleveland. It involves some innovative lighting techniques, a lot of public art, tilework and then <br />the sculpture of Stephanie Tubbs Jones herself. ' <br />We also work extensively at Case Western Reserve University on their campus and redid their <br />campus fountain area with all pervious pavement and a new drainage system which essentially <br />eliminated all of the catch basins on that particular site. We continue to work on a range of <br />projects there including the new plaza that's going around the Museum of Contemporary Art <br />that's currently under construction. That will be done actually in September of this year. <br />We are very involved with the Dunham Tavern Museum. I am a trustee down there. That's at <br />East 67t' and Euclid. We recently purchased an old warehouse building and tore that down. We <br />are creating a pretty substantial greenspace in the heart of the City.