v. <br />and a special permit for a non-conforming building. The board had reduced the sign variance <br />from 240 square feet to 200 square feet for area. Since there was no July 19th Council meeting <br />and because they had met most of the requests, the Planuing Commission referred them directly to <br />the Architectural Board and then on to B.Z.D. He explained that Best Buy will be using several <br />of the existing vacancies, and will be constructing a 10,000 square foot addition in the rear. He <br />introduced Mr. Fiala, architect for Best Buy, who explained they were remodeling a 46,000 <br />square foot area, the frontage will be 240 feet and it will be about 171 feet, 6 inches deep. The <br />building will be roughly from the edge of MC Sporting Goods to the edge of the existing <br />Hallmark Store. He presented a composite view of the front elevations and a photograph of the <br />rear of the development. He noted that the Marshall's store was the most dominant visually, and <br />explained that because Best Buy will be the largest tenant and because of Planuing Commission's <br />request, they are keeping the Best Buy store to approximately the same height as the Marshall's <br />store, only about 1 or 2 feet higher, but visually they will be about the same. Constructing the <br />building between two existing tenants presented a problem and they also re-evaluated the existing <br />materials and have upgraded them so that they would be similar to those on Plaza North. They <br />will be using a Bowerston face brick #645 which is used on Plaza North, the two towers are <br />tubular steel, everything on the Best Buy portion will be masonry or matching the tubular steel <br />with a synthetic stucco.on the upper portions. The split face block will be above the brick and will <br />match the brick on Plaza North, but they do need to find a color of brick in between the two <br />bricks shown. The darker stucco is a sandalwood beige #1 with the lighter one Amarillo white <br />which will match the existing and they vvill be adding modules of china white which will project <br />from the building in areas similar to the mirrored squares that are now on the plaza and give the <br />illusion of the mirrors without being a mirror. The, colors will approxiinate the colors on Plaza <br />South, the patina green on the metal roofing will match that on Plaza North and the aecent band <br />on Plaza north is the same red as the aluininum store front shown on this plan. Mr. Papandreas <br />explained that the intent was to create an elevation that would be compatible to the existing Plaza <br />South architectural character, but is sensitive to, and compatible, to Plaza North's recent <br />renovation. Eventually they intend to market these as the same unit and this change will probably <br />be indicative to °what they will be doing at Plaza South in the future. Mr. Fia1a explained that they <br />had to close up the two flanks adjacent to the existing tenants by using architectural pre-cast 10 <br />foot wide insulated panels that are fabricated off site and erected on site to minimi?e risk to the <br />other tenant units. He presented samples of this material which will be in gray tones to match the <br />rear of the plaza which currently has a 6 foot dark gray band with a lighter gray above it. They <br />will use a precast concrete on the lower 6 feet with lime stone chips, and the top is a sand blasted <br />surface so that it has some texture with a seam separating the two finishes. Mr. Papandreas <br />presented an aerial view of the rear of Plaza South and explained that the addition would bump <br />out to the same setback line that Gentry's loading dock now has, squaring off the back and <br />pushing all the service to the north, as far away from the condominiums as possible (about 350 <br />feet away from the closest corner). They had to relocated the existing MC Sporting Goods truck <br />dock. He advised Mr. Zergott that they would try to renovate the rest of Plaza South including <br />the removal of the murors in the future, if they removed the mirrors at this time, there would be <br />damage to the bu.ilding, so that must be done along with a renovation. Mr. Gould, president of <br />Biskind Development, advised that this renovation would probably be done in about two years. <br />Mr. Papandreas stated that structurally it would be difficult to renovate, since the structure is built <br />right out to the plane. Where as the structure at Plaza North is built to the store front and the <br />2