Laserfiche WebLink
<br />PLANNING COMMISSION APRIL 27, 1982 PAGE 2 <br />in that the size of the building has been enlarged to <br />16' x 50' in order to accomodate a mini-grocery store, and <br />the canopy will be 10' longer. Set backs conform to all <br />codes, a retention system will be installed and permission <br />has been granted to_.tie into Basco's sewers, traffic pat- <br />tern will remain the same. J. Roberts moved to refer the <br />Gastown gas station proposal to the Architectural Board <br />of Review, and to the Safety and Engineering Department <br />for their review and comments, seconded by J. Brown, and <br />unanimously approved. <br />(3) Arby's Restaurant, 26368 Lorain Rd. <br />Proposal to construct drive-thru window. <br />G. Draeger, Architect, explained the plans for the drive- <br />thru window. The seating will be reduced to 40, mainly <br />because 40% of the business willthen be conducted through <br />the proposed window. Mr. Gundy.advised that there will <br />be 13 parking spaces in excess of the code. Since there is <br />a combined drive between Arby'sand.the adjacent Milton's <br />Restaurant, the Commission is concerned about the traffic <br />pattern through the diive-thru., and how it would affect <br />adjacent drive and parking at Milton's. Mr. Georgalis, the <br />owner of Milton's, agreed that this will create problems <br />with his drive unless he could have his exit behind <br />Arby's to Silverdale Rd. The Commission also is concerned <br />about the guard rail that is to extend into the front set <br />back and will divide the two properties. Mr. Draeger sug- <br />gested that the Planning,Commission could be be instru- <br />mental in arranging an agreement between the two parties <br />concerned. The Commission requested that an overlay of the <br />parking and traffic patterns be made of the two properties <br />and that this be submitted to Planning Commission.. B. Gorris <br />moved to refer the Arby's proposal to construct a drive- <br />thru window to the Architectural.Board of Review and also <br />propose that the Architect present an additional drawing <br />overlaying the existing Milton's property and parking • <br />spaces on top of the new one and showing the overall traf- <br />flow; pattern and total parking spaces, and also suggest <br />that attention be given to the five parking spaces im- <br />mediately south of the building especially in light of the <br />fact that they are proposing two way traffic there; at the <br />same time I would like to send this proposal on to the <br />Safety Director and Engineering Department for any imput <br />that they may have,, the overlay should also be sent to all <br />parties concerned, seconded by T: Morgan, and uanimously <br />approved. (4) Suburban Auto Body, 4960 Dover Center, Rd. <br />Proposal to construct addition. <br />Heard by the Architectural Board of Review, April 19, 1982.