Laserfiche WebLink
.r <br />? <br />• <br />k::S.?,,,?.:.?• . -PLANNING COMMISSION APRIL 22, 1980 PAGE 4 <br />lot during the beginning and end of each session. J. P rokasy <br />moved that the proposed Skating Rink Proposal between Lorain <br />and Mill Roads be put in committee and that the Developer be <br />given the opporttmity as per their agreement to resubmit a <br />set of plans that would encompass all the recommendations of <br />. the Architectural Board of Review, the recommendations of the . <br />Safety Director and to what extent they will do it, reply in <br />writing to those recommendations from the Safety Director <br />they feel they cannot abide by, and s tate the reasons.why, <br />.. and also should include proper screening from automobile <br />•lights to protect the ad3acent property owners, particularly <br />the property owner to the west and the Olmsted Manor Nursing <br />_Home,to, the north, and.that . there be appropriate landscaping <br />on the Mill Road frontage and that :they be::referred back to the Architectural:Board of Review for these plans, seconded <br />. , -. ? by T. Morgan; :and imanimously approved. <br />North Olmsted.IInited Methodist Church, 4600 Dover Center Rd. <br />Thomas Moore, Architect, explained the revised plans which <br />? have incorporated the recommendations.of the Architectural <br />Board.of Review Meeting of Aiarch 17, 1980 and that they , .. - also will.conform to the request of the Architectural Board <br />of Review of April 21, 1980 to include a handicaped ramp. <br />. The screening required by the Board of Zoning Appeals on . <br />March 5, 1980 is also-included in this.plan. Assistant <br />, City Engineer D:.McDerott advised that the retentton system <br />. is adequate. J. Roberts moved to recommend agproval of the <br />North Olmsted United Methodist;Church Addition with the <br />,.: recommendations--of the. Architectural--Board of Review,. seconde.d <br />, . .._.by.-J..= Brown,'==and:-.lmanimouslY?$PProved. ; . . . <br />. 10 Minute Lubrication Center, 25715 _Lorain Rd. <br />Review by"the Architectural Board of Review of April 21,'1980. <br />. Mr. Ian Ciishenan and L. . Gregg introduced the plans which-have - <br />- included -the recommendations of the Architectural Board, of <br />Review. '-They displayed 2 pictures of overhead glass doors <br />which wi].l meet_the basic requirements of the Architectural Review Board's stip ulations. J. Prokasp moved to approve the <br />10 Minute-Lubrication Center, including the recoTnmendations <br />of the Architectural-Board of,Review, seconded.by J. Roberts, , <br />and tmanimously, approved. At`:the request of Mr. .Cushenan. for ' <br />- clarification.of which door to'install, J.:Prokasy then a:-`:.... mended his"motion.to include recommendation".of the 4 panel door.,.- <br />- " as shown by the Developer, seconded by J. Roberts, and unani- ;. <br />. , ` mously approved.. . : . ? : <br />(b) Paradise Pontiac;:25870 Lorain Rd. , <br />It was explained that this.is an addition adjoing the side .? <br />of the exd.sting show room and will be an exact duplicate. <br />" J. Prokasy moved to refer the Paradise Pontiac Addition to <br />the Architectural Board of.Review, seconded by T. Morgan and <br />, unanimnusly approved. . .: .