• Incorporated other landscaping recommendations along the west property line <br />• Ensured signage incorporated materials used in the building <br />• Possible location of RTA bus stop is now shown <br />• Add bike racks and bike storage <br />However, the applicant did not submit the requested lighting plan, including bronze site lighting <br />fixtures and decorative fixtures along the walking path with cut sheets of fixtures and a revised <br />photometric plan. <br />The applicant was not successful in obtaining relief from a deed restriction requiring a 200 foot <br />setback from the Metro Parlc property on the east parcel; therefore, the revised plans show the <br />building moved forward on the site to meet the requirement. The shift caused the building to <br />encroach upon the required front setback, which necessitates a variance. She recommended that <br />the proposal be forwarded to the BZA with recommendations from the Commission and as no <br />lighting plans had been submitted she recommends all lighting requirements be met and require <br />no variances. <br />Assistant Engineer Becker indicated that she had asked for revised plans September 7`" which <br />had yet to be received. However the building plans submitted show the carports moved away <br />from the sanitary sewer easement area. The detention basin looks to be larger, but things to be <br />noted are; 1) An easement is required from adjacent property owner for the storm water <br />detention system. 2) Applicants are required to meet all EPA requirements pertaining to storm <br />water quality as there is more than 5 acres. 3) Code allows a maximum drive width of 24-feet <br />and applicants drive as shown is 25-feet. 4) Applicants need a 25-foot radius for the drive-apron <br />but show 10-feet which should be shifted 15-feet away from the property line. <br />Mr. Berardi apologized for not submitting the photometric plans and cut-sheets but intend to do <br />so prior to permits being issued. The bike storage was to be shown in a garage area however it <br />was noted but not shown. Regarding the deed restrictions concerning the Metro Park the area of <br />concern is the north eastern corner of the building only which is within 186-feet to the Metro <br />Parks. After numerous meetings with the Metro Parks it was decided to move the building <br />which encroaches upon the Lorain Road front setback. All EPA and engineering issues would be <br />addressed including the radius of the roads meeting code requirements. The material list was <br />submitted at a prior meeting for the ARB. <br />Ms: Wenger discussed the variances required. She said that the engineering and zoning issue <br />along the west side of the site pertaining to the side yard setback could be addressed by shifting <br />the building 15-feet to the east. Although the west side yard variance would be eliminated and <br />an east side yard variance would then be created it would solve the engineering concerns and <br />increase the buffer for the parcel to the west. Planning Commission agreed that the buffer area <br />along the west side should be increased. The 15-foot variance for building to close to right of <br />way is to address the Metro Park deed issues. The Metro Parks would not relieve the applicants <br />of the deed restriction without being given additional acreage which would hinder any future <br />development of the site. Therefore she recommended the variance be granted. The third <br />variance is for insufficient parking spaces, which is partly calculated on the number of <br />employees which has not been provided; therefore it is not sure if a variance would be required. <br />She further suggested that it was also within the discretion of the Commission to allow <br />landbanked parking to accommodate more greenspace. 2 <br />