Road right of way, which would make the lot extremely challenging to develop. The applicant's <br />proposal would result in the area being more conforming to required setbacks. <br />Mr. Collins recommends a right turn arrow and/or right turn only sigri on the drive apron to <br />Lorain Road. The landscape plan does not accurately reflect the site plan at the southeast corner <br />of the building. Engineering recommends the 36 foot drive entrance for truck maneuvering. The <br />grading plan shows the site being raised 4-5 feet, presumably for storm water drainage but needs <br />to be clarified. Mr. O'Malley reviewed the planning role versus that of the BZA as it pertains to <br />variances. Where possible, the Commission should work to eliminate variances, such as the <br />variance for landscape irrigation. <br />Mr. Lewis spoke on behalf of Walgreens. They have been given the authority to purchase and <br />represent the property owners in question. An aerial map was distributed showing the area. The <br />approx 14,000 square foot building will replace ten structures currently on the site, with a project <br />area of 1.91 acres. All improvements will be located on the commercially zoned side of the <br />property. The code requires 58 parking spaces. The proposal includes a drive through on the <br />east side; on the north side will be trash compaction, tote enclosure and deliveries. All <br />enclosures will be masonry with a board on board gate. Adequate lighting is added to the <br />parking lot while preventing spill over to adjacent properties. The planting areas around the site <br />contain sod, bushes trees and plants which will be irrigated. There are 2 curb cuts, one to Lorain <br />Road, and one to Columbia Road. The curb cuts are safer than the present flow of traffic and are <br />located as fax away from the intersection as possible. New sidewalks, new curb, new brickscape <br />will enhance curb appeal. The bio retention area is north; buffering the properties to the north <br />will be an 8 foot vinyl fence. The adjacent property owner is not opposed to adding a vinyl fence <br />to the property. The building will be constructed of finished masonry products such as a medium <br />tan brick, limestone towards the top, and split faced block towards the bottom. Green awnings ' <br />will follow the window line. Pilaster elements are added along all elevations for aesthetic <br />enhancement. ' A vine trellis will be added to the east side of the building, possibly with wisteria. <br />Ms. Meredith read Mr. Rerko's comments. He wrote that the ground sign should be set back for <br />traffic visibility and recommended fencing the bioretention pond. He does like the design but <br />would like material samples. He requested internal downspouts, and that the tote enclosure has <br />the green metal roof. Mr. Lewis said they did not move the ground sign because of the need for <br />visibility and the proximity to the parking and landscaping. Mr. Collins felt the ground sign <br />placement was adequate. <br />Mr. Malone clarified that the applicant would install an irrigation system. He asked the applicant <br />to provide more information on the bio retention basin, including a planting plan. He did not <br />believe a fence vvas necessary as the basin would contain soil and plant life. Walgreens would <br />like a fence for safety, which they said could be decorative. Mr. Malone recommended planting <br />bushes in front of the decorative fence. He said the choice of plant material is good however the <br />evergreens should be 7-8 foot at planting. The brickscape will be pavers. Mr. Malone <br />recommended a tree survey to determine if significant trees in the basin area could be saved. <br />The Commission discussed the potential of landbanking 5-10 parking spaces along the north and <br />west property lines near the Columbia Road curb cut in order to increase the green buffer to the