Laserfiche WebLink
the boundaries of upholding the intent of the zoning codes and would not alter the character of <br />the neighborhood or create adverse impacts nor would governmental services be altered. <br />Mr. Conway said that the lot was a unique size and shape and when the code was written <br />regarding the setback of a corner lot the majority of the lots abutted residential districts however <br />this site abuts multi family zoning which requires a 100 foot setback. The site/lot can not <br />accommodate the required 100 foot setback for the proposed use nor any other use including <br />multi family. Therefore the setback conditions are too restrictive. The 5 foot setback variance <br />the applicant has explained. Request #4 is for total square footage of signage on a building not <br />total canopy signage and he does not believe that the request is excessive. The additional canopy <br />is due to the rear canopy sign being visible to abutting lots. He advised that directional signs are <br />counted as ground signs therefore a variance for two additional ground signs are required. The <br />pharmacy logo which is in the window is not considered a wall sign but as it is a permanent sign <br />it is calculated in the total square footage of signage on the building. Mr. Jurisch said both <br />directional signs would be a total of 6 square feet and are needed for safety. Mr. O'Malley <br />reviewed the charge of the board and how they should address all cases which come before them. <br />Mr. George was concerned over the number of variances requested for a new development. The <br />owner purchased the land knowing variances were required. They had an opportunity to purchase <br />enough parcels which they chose not to pursue. The building is too large for the lot and the <br />sideyard is only 5 feet off his building. The building placement will block his business from <br />view and the (Lorain) curb-cut blocks his curb-cut. Granting the 5 foot sideyard variance places <br />a hardship upon his lot. Mr. Murray voiced concerns with parking, light spillage and the number <br />of deliveries and size of trucks making deliveries. He questioned hours of operation and said <br />traffic during holiday seasons is bad and the new business will add traffic. Ms. Soltis is <br />concerned the development will damage the detention wall, driveways, garages and lover level <br />condos with stormwater run off, heavy snow and increased traffic. Ms. McCartney felt the two <br />existing drugstores nearby are sufficient. Mr. George said his retention drains to Lorain Road <br />and questioned were the applicants would drain Lorain or Columbia Road. <br />Mr. Lewis said removing existing structures and the placement of the building would provide <br />Mr. George's business more visibility as it lines up with his building. Snow storage will be <br />placed to ensure it drains into the bio-retention system as it melts. Lorain Road curb-cut is right <br />in right out only so it does not block neighboring curbs. The bio-retention system meets all city <br />code requirements and was oversized to ensure water would not be an issue. The Columbia <br />Road ingress/egress is three lanes to ensure traffic does not stack and vehicles can enter and exit <br />the site. <br />Mrs. Sergi did not believe testimony was given justifying a 5 foot sideyard variance required. <br />The 52 foot building setback based upon the building commissioner's comments is not <br />unreasonable. The width of the driveway is reasonable to allow better traffic flow. Two <br />additional ground signs are warranted for vehicle safety. Ms. Rudolph felt both the 5 foot east <br />side setback variance and total square footage of signage was problematic as well. Although she <br />is sympathetic to the neighbors' issues, the BZA cannot.address those issues. Mrs. Bellido was <br />concerned that vehicles in the drive-through lane in an emergency could not safely exit and felt <br />signage square footage should be met. Mrs. Sergi did not object to total square footage of <br />2