My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/25/2002 Minutes
Document-Host
>
City North Olmsted
>
Boards and Commissions
>
2002
>
2002 Planning Commission
>
06/25/2002 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 12:49:00 PM
Creation date
1/28/2019 5:56:03 AM
Metadata
Fields
Template:
N Olmsted Boards & Commissions
Year
2002
Board Name
Planning Commission
Document Name
Minutes
Date
6/25/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LA <br />refurbished in full and all trees be replaced were they were originally. C. Allan seconded the <br />motion, roll call on the motion; J. Lasko and K. O'Rourke "No", C. Allan and W. Spalding "Yes". <br />Proposal Tabled. <br />Mr. Dzwonczyk questioned the reason for the objections. Mr. O'Malley indicated that the <br />proposal would have to return to the next Planning Commission meeting as there were not four <br />affirmative votes. Mr. Lasko voiced that he was not concerned with the blue color. He believes <br />that a brick fagade would provide an upscale appearance and the two different color schemes will <br />provide the contrast needed between the two sites. W. Rymarczyk indicated that if changes are <br />made to the drawings, the new drawings need to be submitted no later than the Thursday, before <br />the Planning Commission meeting, or the proposal would be tabled. Furthermore,- a new set of <br />plans for the Clague Road site will need to be submitted before the proposal will be forwarded to <br />the Board of Zoning and Development. Currently the Building Department has no plans reflecting <br />the brick or other changes that have been made. Mrs. O'Rourke voiced that she would' rather have <br />brick used and less blue used. Mr. Dzwonczyk remarked that he was not in a position to agree to <br />brick at this time. <br />5. Linder & Associates (Water Tower Square): 4998 Dover Center Road: <br />Proposal consists of replacing existing building with a new 6,090 square foot building. <br />Acting Chairman Spalding called all interested parties forward to review the proposal. Mr. <br />Bradford, the attorney for Water Tower Square, and Mr. Davison came forward to review the <br />proposal. W. Bradford suggested that Linder & Associates have been in the North Olmsted area <br />for about 10 years. They would like to have a new location for their office. Carnegie Management <br />would eventually like to acquire the entire area between Mill Road and Lorain Road. The existing <br />Heller Restaurant and rear building would be demolished. They are present to see if Planning <br />Commission will give a favorable recommendation to the Board of Zoning Appeals too grant the <br />necessary variances. The current building codes for pover Center Road require a 75-foot setback <br />from the right-of-way. The current Heller building has the canopy iri the right-of way. T e rear <br />setback for the building line is 25-feet. As the owner of the rear land, Carnegie can guarantee it <br />will not be developed. Without the variances required, there is no way to place a building on this <br />lot. W. Davison the Architect indicated that the new building would be a 6,090 square foot office <br />building. The building will meet the parking requirements and mentioned there will be 2 setback <br />variances required. In the front of the lot,- there will be a 20-foot landscape buffer, which will <br />include trees. The building entrance will face Water Tower Square Center, as it will be their outer <br />building. There will be some lighting on the site and an enclosed trash area. The air conditioning <br />units will be interior with ground condensers screened with landscaping. The entrance or.top <br />elevation will face Water Tower Square. The building materials will match the existing Water <br />Tower Square. A light-buff color split-face block with red accent band through the building. <br />There will be 3 wall signs placed on the building depicting the three different divisions of the <br />company. The Dover Center side of the building will also have a front appearance, which will <br />include signage at the corner of the building, red band and glass entries. Mr. Rymarczyk indicated <br />that there was also a rear setback for parking that will be required. A loading zone is not shown on <br />the drawings, but the site seems to have adequate space for one. The layout of tfie parking plans <br />and the pfiysical layout of the site do not agree. Mr. Davison suggested that part of the existing <br />green space would be removed to accommodate the parking. Mr. Rymarczyk suggested that as the <br />plans do not reflect what is being said an additional variance might be required. Mr. Bradford <br />questioned if the plans could go before the Board of Zoning Appeals if the plans reflect the <br />adjustments. Mr. Davison indicated that as they have more than enough parking spaces for the lot <br />they could remove 4 parking spaces from the plans. Mr. Rymarczyk indicated that as the <br />6
The URL can be used to link to this page
Your browser does not support the video tag.