. <br />The applicant said that the antennas are mounted flush on the penthouse and will not be <br />protruding above the penthouse line. Mr. Yager asked the applicant to look at the stealth <br />inounted scenario and make a panel that goes across the whole face of the penthouse in order so <br />the boxes are not in view. Mr. Yager asked the applicant to coordinate the colors that blend in <br />with the building. The applicant said that there will be four mounted antennas that will be on the <br />east, west, north and south sides of building. <br />Ms. Wenger asked that if it is the Commission's desire to grant a conditional use permit, she <br />requires that the applicant submit revised plans showing the stealth mounted design before the <br />plan goes to Council for approval. <br />Chairman Koeth moved to approve the Fiber Tower Corporation, 25151 Srookpark Road, <br />conditional accessory use of the addition of the macrowave technology with the stealth <br />mounting with the antennas on four sides of the penthouse on the Westbury building. Mr. <br />Amine needs to submit new plans to the Planning Director showing the stealth mounting on <br />eacla side building, lblending to match the color of the existing penthouse. Mr. Lasko <br />seconded, which was unanimously approved. <br />Turf Specialist Inc., 31407 Bradlev Road: (WRD 3) <br />Proposal consists of a proposed pole building to be used as an addition to a storage shed for <br />storage of equipment. Note: Architectural Review Board addressed this proposal on 10-20-04 <br />Ms. Wenger said the applicant appeared before the Architectural Review Board and the <br />recommendations made were incorporated into the plan, including the roof color change from <br />green to brown to match the existing structure, adding six white pine trees along the side of the <br />storage shed and additional trees around the detention area and modifying the lighting to <br />eliminate the need for a variance. Mr. Rymarczylc said one variance will be required for the <br />location of the driveway, as the Code requires 10' off the lot line, currently it is at 2' off the lot <br />line. The applicant is very tight on room and is looking for an 8' variance. <br />Mr. Durbin reported that on October 7"', Assistant City Engineer Cathy Becker sent the applicant <br />a letter stating items that need to be addressed. As of today, six items still needing attention are: <br />1. Storm water management calculations were not submitted. <br />2. Drainage swale needs to be provided on the east property line to prevent storm water from <br />running off onto the adjacent property. <br />3. Building downspouts need to be tied into underground storm sewer which outlets into the <br />detention basin. <br />4. Storm water from the new and pervious asphalt driveway needs to be directed into the <br />detention basin. <br />5. The proposed slopes and grades are shown on the driveway. <br />6. The first four elevations of the proposed storage building need to be provided. <br />Mr. O'Malley recommends that the engineer's six conditions are included in the motion. The <br />applicant was informed that all conditions must be signed off on before a building permit can be <br />issued.