Laserfiche WebLink
4 Middough <br />Consulting Inc. <br />ARCHITECTS • ENGINEERS • CONSTRUCTORS <br />to temporarily diverted during the construction of the entry. Public and employee entry into <br />the building will be through other entry indicated by the CNO. <br />m. Lighting to match existing. A floor outlet is to be provided in the center of the Caucus Room. <br />Provide a blank junction box sand conduit to the center of the $ oor of the Caucus Room for <br />recording of meetings. This junction box and conduit will be later wired by the city. <br />n. Provide electric snow melting mats in both entrance ramps. Bid form should indicate this <br />work as a required alternate. <br />5. CNO will provide all front -end documents. <br />.6. Drawings of the building are available from Tom Rymarczyk of the city building department on <br />microfiche. <br />7. Kim Wenger will be the contact person for the project. PDF files can be emailed to Kim for <br />distribution to the city for review. <br />8. Midd should send a revised proposal to Kim Wenger of CNO for the 9:30am Tuesday morning <br />meeting. <br />Submitted by, <br />MIDDOUGH CONSULTING INC. <br />Geoffrey Keehn <br />N:1C8y North 01m9ted.d6X0N004011C0rr1Mee9n9 minutee1CN00401 Mtg Min 05=3.doe <br />.. <br />