Laserfiche WebLink
^ J ?'•'?J=-•?o?_ -. ? ?' ?:,L <br /> <br />SECTION III - SCOPE OF WORK <br />Attachment One, hereby incorporated into this Agreement in its entirety, shall constitute a complete <br />and detailed description of the PROJECT with respect to the scope and intent of the transportati4n <br />irnprovement(s) to be constructecl. Seciion V details the categories of zelevant development <br />activities and their costs, and the specific sources and status of funds to be made available xor their <br />accomplishment. <br />SECTIaN N - GENERAL REQUIREMENTS <br />The I.PA shall designate a fully qualified prnfessianal engineer to act as Project Engineer and serve <br />as the LPA's grinciple rcpresentative for the PROJECT. Detailed desi gn, preparation of construction <br />plans and specifications, and other development activities for the PROJECT shall be perforrned by <br />or under the close direction of thc Project Engineer. <br />lle LPA shall camply with all applicable State laws, regulations, and executive orders. This <br />obligation is in addition to compliance with any law, regulation or executive order specifically <br />referenced in °s Agreement. <br />SECTION V- COST SHARTNG AND LISF OF FtNnc FnR THE 03ECT <br />As set farth in Attaclunent One hereto, the total eligible cost for the PROJECT is estimated to be <br />Une Million Four Hundred Ninety Thousand Dollars ($1,490,000). Funds provided through <br />ODOT shall be applied only to the eligible eosts associated with ttze actuat construction of the <br />PRQJEGT and construction engineering/inspection activities. The costs ofpreliminarydevelaprnent, <br />final anginoering design, the acquisition of right of way, and general administration are not eligible <br />for funding under this Agreement. Fmm the State Highway funds raade available for these pucposes <br />by the Director, ODOT shall provide the LPA with eligible costs associated with these agproved <br />categories at a rate of Eighty Percent (80%), up to a maximum of One Milleoa One Hundred <br />Ninety-iwa Thonsasd Dollars ($1,192,000). Thimaximtun Sta.te smount reflects the ftmding <br />limit for the PROJECT set by the Program Manager. The LPA shall provide all other financial <br />resources necessary to fully complete the PROJECT, inclusive of cost overruns and contractor <br />claims. ' <br />SECTFON Va - ADA COMP?,TANCE <br />As part af the PROJECT, the LPA shall install andlor repair all curb ramps which aze <br />necessary to ensure carnpliance with the Americans with Disabilities Act and the <br />LPA agrees to assume and bear one hundred percent (100%) of the cost af such <br />installation and/or repair of curb ramps. <br />Paqe 2