My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2008
>
2008-009 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 4:05:49 PM
Creation date
12/30/2013 8:47:54 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2008-009
Legislation Date
2/5/2008
Year
2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ?. I <br />Duane K. Limpert, Director of Public Services <br />January 14, 2008 <br />Page 3 of 10 <br />capacities and improvements to the wastewater treatment plant and collection <br />system. <br />1.2.2 ATS sha11 meet with necessary City staff and incorporate their input regarding the <br />selection of equipment, processes and collection system improvements into the <br />PER. <br />1.2.3 ATS shall meet with funding providers and/or the Ohio EPA to insure the PEA <br />meets all necessary requirements. <br />1.2.4 ATS shall accompany City staff on tours of other facilities to evaluate the <br />processes and equiprnent being recommended for the Project. <br />1.2.5 The PER will be completed within 120 days of receiving the notice to proceed <br />from the City. <br />1.3 FINAL DESIGN SERVICES <br />1.3.1 ATS shall proceed with final design based on written notice by the City. The City <br />will provide written notice to proceed for fmal design based on the Ciry's <br />acceptance of the "Preliminary Engineering Report". <br />1.3.2 Final design of the Project will proceed on the basis of the accepted-Preliminar"y <br />Engineering Report. <br />1.3.3 ATS shall rneet with necessary City sta.ff on a regular basis to review desrgn <br />progress and incorporate their input regarding the fmal design of the Project. <br />1.3.4 ATS shall meet with funding providers and/or the Ohio EPA to insure the final <br />design meets all necessary requirements. <br />1.3.2 ATS shall provide technical criteria, written descriptions, and design da.ta for <br />City's use in filing applieations for obtaining permits and/or approvals of such <br />governmental authorities as having jurisdiction to approve the design of the <br />Project and assist the City in consultations with appropriate authorities. <br />1.3.3 ATS shall advise City of any adjustments to the latest opinion of probable Project <br />cost resulting from changes made in final design. ATS shall furnish City a <br />revised opinion of Project cost based on final drawings and specifications for the <br />Project. <br />1.3.4 ATS shall prepare for review and approval by City, its legal counsel and other <br />advisors, construction documents including contract agreement forms, general <br />
The URL can be used to link to this page
Your browser does not support the video tag.