My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-099 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2000
>
2000-099 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 4:10:48 PM
Creation date
12/30/2013 8:17:39 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2000-099
Legislation Date
7/18/2000
Year
2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
T <br />Ralph Bohlmann <br />July 10, 2000 <br />Page 3 <br />Completion of Active Actions for the Project <br />Since approval of the 2000 Wastewater Division Budget Authorization, several <br />critical items have been initiated consistent with the original project schedule. These <br />critical items were started in order to have a complete high speed, high solids, solid bowl <br />dewatering centrifuge system in full operation by the end of 2000 supported by a <br />temporary sludge pumping and piping arrangement. The original project schedule also <br />called for completion of the sludge pumping and piping arrangement and acquisition of <br />major dewatering centrifuge replacement parts in 2001. <br />Actions have already been started in 2000 based on the original project schedule. <br />These actions are in addition to two actions that were initiated in late 1999 and have since <br />been completed. The following table identifies the initiated actions and the completed <br />actions: <br />Action Funding Source Current Status <br />Purchase of Electrical Conduiting 1999 Plant Equipment Completed <br />and J-boxes line item <br />Purchase of a new Sludge Feed 1999 Plant Equipment Completed <br />Pump Variable Frequency Drive line item <br />Modification of Odor Group B/C 2000 Plant Equipment Completed <br />Motor Control Center line item <br />Change of Biosolids Disposal 2000 Sludge Disposal Completed <br />Method line item <br />Purchase of Spiral Stairs 2000 Dewatering Centrifuge Awaiting delivery in July <br /> line item 2000 <br />Purchase of Moyno Pipeliner 2000 Dewatering Centrifuge Awaiting delivery in July <br /> line item 2000 <br />Professional Services Assistance 2000 Consultation Services Services started during last <br />Contract line item week of June 2000 <br />Purchase of Dewatering Centrifuge 2000 Dewatering Centrifuge Awaiting completion of <br />Sludge Feed Flow Meter line item pilot testing work <br />Purchase of IVloyno Sludge Cake 2000 Dewatering Centrifuge Awaiting completion of <br />Pumn line item pilot testing work <br />Funding Source for the Recommended Lease <br />The source of funds for the recommended lease would be the $250,000 <br />dewatering centrifuge amount contained in the Capital Improvements line item of the <br />2000 Wastewater Division Budget Authorization. These funds were authorized by City <br />Council for the acquisition of a complete high speed, high solids, solid bowl dewatering <br />centrifuge system having a capacity of 25 gpm to 40 gpm. <br />As a result of this lease recommendation, the entire $250,000 amount will likely <br />not be encumbered during 2000. The following table presents a breakdown of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.