Laserfiche WebLink
- <br />Project Personne! 5-4 <br />• Managed odor studies at the 1.3-mgd industrial and 3.5-mgd domestic wastewater treatment plants <br />in Austin, Minnesota. Collected and summarized on-site data, ranked and prioritized odor sources, <br />and recommended preliminary odor mitigation steps. <br />• Prepared a facility plan to upgrade a 0.28-mgd wastewater treatment plant and developed an interim <br />plan for disinfection dechlorination improvements for Prescott, Wisconsin. <br />• Preparation a facility plan alternate design and cost analysis of alternates to eliminate bypasses at <br />the 1.2-mgd wastewater treatment plant in the city of Two Harbors, Minnesota. <br />• Managed the addition of a chlorine tank, dechlorination building, and dechlorination equipment at <br />the 7-mgd wastewater treatment facility in North Olmsted, Ohio. <br />• Managed the design and construction of the 24-mgd advanced wastewater treatment expansion in <br />Muncie, Indiana. <br />• Participated in the 27-mgd advanced wastewater treatment plant expansion in Anderson, Indiana, <br />which involved adding a blower building and wet air oxidation and sludge dewatering facilities. <br />• Designed improvement projects for wastewater treatment plants and interceptor sewers for the <br />cities of Rushville and Seymour, Indiana. <br />Wastewater Collection <br />• Managed the preliminary and final design for the rehabilitation of a 22-mgd submersible pump and <br />a new 50-mgd wet-weather pump at the Scott Street pump station in Houston, Texas. Designed <br />both open-cut and caisson construction options, as well as odor control facilities to feed ferrous <br />sulfate to the pump station wet well and to drain the wet-weather force main when not in use. <br />• Participated in the design and construction of a 8.5-mile interceptor in Anderson, Indiana, which <br />involved special structures, highway and railroad tunnels, creek crossings, and a wide variety of soil <br />and groundwater conditions. <br />• Served as project manager for advanced facility planning and plans and specifications for the 30- <br />foot-deep, 16-mgd Crreenfield park pump station, including 2,000 feet of 24-inch force main for the <br />Milwaukee Metropolitan Sewerage District in Wisconsin. <br />• Managed a walk-through inspection, facility evaluation, and plans and specifications for the <br />rehabilitation of 9,500 feet of 5- to 6-foot-diameter brick and segmental tile interceptor sewer, a <br />30-mgd temporary pumping station, and 8,600 feet of 30-inch force main for the Northeast Ohio <br />Regional Sewer District in Cleveland, Ohio. <br />• Managed the renovation of the 6.5-mgd Dille Road, 7.2-mgd Division Avenue, and 3.2-mgd <br />Jennings Road sewage pump stations and construction of a 1,700-square-foot service garage at the <br />Jennings Road station for the Northeast Ohio Regional Sewer District in Cleveland, Ohio. <br />• Managed sewer system evaluation surveys for 960,000 feet of sewer in the Belvoir study area in six <br />suburbs and 460,000 feet of sewer in the Strongsville area of two suburbs of Cleveland. Oversaw <br />mapping, flow monitoring, rainfall simulation, sewer cleaning and televising, and cost-effective <br />analysis for the Northeast Ohio Regional Sewer District. <br />