<br />Project Personne/ 5-7 <br />tensioned structure. Managed investigations to establish renovation requirements for the garage, <br />including structural, drainage, mechanical, and electrical system evaluations through design <br />development documents and assisted in analyzing feasibility of replacement versus renovation. <br />Managed the electrical and mechanical design, plans and specifications, and construction <br />administration for the Northeast Ohio Regional Sewer District's 112,200-square-foot district <br />operations center and vehicle maintenance building, including a wastewater testing laboratory. <br />Industrial Wastewater Treatment <br />• Managed a capacity study of the Blooming Prairie and Elf Atochem wastewater treatment facilities <br />to assess their potential for accepting additional load from the industry. Collected and evaluated <br />existing data for the sequencing batch plants at both sites. Developed recommendations for <br />equalization and nutrient addition improvements at the industrial facility, which improved <br />performance for additional loads. <br />• Managed a design/build project to provide water treatment and cooling for 9,330 gallons per minute <br />of process contact cooling water for the Charter Steel rolling mill in Saukville, Wisconsin. Installed <br />inside scale pit pumps, circulaz outside scale pits to provide additional scale and oil removal, filter <br />feed pumps, high-rate filters for solids removal, cooling towers to provide water temperature <br />control, and return pumps to provide cooling water at SO psi to the rolling mill stands. <br />• Conducted a mitigation study to minimize odors from the primary clarifier at LSPI paper mill and <br />Superior Paper Industries in Duluth, Minnesota. Analyzed existing data and performed odor, air, <br />and wastewater testing. Recommended revising pH adjustment procedures, which minimized odor <br />complaints from the clarifier. Subsequently conducted sampling, characterizing, and prioritizing of <br />air emission sources at both sites. <br />• Led the process team for the 10-mgd primary wastewater treatment plant and the feasibility study <br />team for planned secondary treatment facilities for a Kimberly-Clark mill that produces 100 tons <br />per day of high-quality specialty papers in Munising, Michigan. Assessed equalization, chemical <br />addition, primary clarifier, neutralization, standby power, sludge storage, and screw press <br />dewatering systems. Provided preliminary site plan layout and sizing for future activated sludge <br />secondary treatment to replace existing lagoons. <br />• Provided the process engineering for design and construction documents for a lime slurry storage <br />and feed system for sludge conditioning prior to filter press dewatering at the waste management <br />CID biological treatment facility in Calumet City, Illinois. Worked on a 6,000-gallon storage tank, <br />lime slurry mixer, transfer pump, transfer piping, and sludge day tank modifications. <br />• Managed activities at industrial wastewater pretreatment facilities in Cleveland, Ohio, to meet <br />copper, lead, and zinc discharge limitations. Developed contract documents and construction <br />services for the 1,000-gpm pretreatment and sludge handling facilities. <br />• Managed the preliminary design, plans, and specifications, for a project in Cleveland, Ohio, to <br />reuse up to 800 gpm of industrial treatment plant effluent for cooling water in the plant by <br />providing pH adjustment, cooling, storage, and pumping facilities. <br />• Served as project manager for an open-channel hydraulics study of flow in the melting area sluice <br />of a plant in Cleveland, Ohio, to minimize flooding of the melt area floor. Prepared plans and <br />specifications for recommended improvements to 3-mgd submersible pumping stations and force <br />_,>r