<br />Project Personne/ 5-7
<br />tensioned structure. Managed investigations to establish renovation requirements for the garage,
<br />including structural, drainage, mechanical, and electrical system evaluations through design
<br />development documents and assisted in analyzing feasibility of replacement versus renovation.
<br />Managed the electrical and mechanical design, plans and specifications, and construction
<br />administration for the Northeast Ohio Regional Sewer District's 112,200-square-foot district
<br />operations center and vehicle maintenance building, including a wastewater testing laboratory.
<br />Industrial Wastewater Treatment
<br />• Managed a capacity study of the Blooming Prairie and Elf Atochem wastewater treatment facilities
<br />to assess their potential for accepting additional load from the industry. Collected and evaluated
<br />existing data for the sequencing batch plants at both sites. Developed recommendations for
<br />equalization and nutrient addition improvements at the industrial facility, which improved
<br />performance for additional loads.
<br />• Managed a design/build project to provide water treatment and cooling for 9,330 gallons per minute
<br />of process contact cooling water for the Charter Steel rolling mill in Saukville, Wisconsin. Installed
<br />inside scale pit pumps, circulaz outside scale pits to provide additional scale and oil removal, filter
<br />feed pumps, high-rate filters for solids removal, cooling towers to provide water temperature
<br />control, and return pumps to provide cooling water at SO psi to the rolling mill stands.
<br />• Conducted a mitigation study to minimize odors from the primary clarifier at LSPI paper mill and
<br />Superior Paper Industries in Duluth, Minnesota. Analyzed existing data and performed odor, air,
<br />and wastewater testing. Recommended revising pH adjustment procedures, which minimized odor
<br />complaints from the clarifier. Subsequently conducted sampling, characterizing, and prioritizing of
<br />air emission sources at both sites.
<br />• Led the process team for the 10-mgd primary wastewater treatment plant and the feasibility study
<br />team for planned secondary treatment facilities for a Kimberly-Clark mill that produces 100 tons
<br />per day of high-quality specialty papers in Munising, Michigan. Assessed equalization, chemical
<br />addition, primary clarifier, neutralization, standby power, sludge storage, and screw press
<br />dewatering systems. Provided preliminary site plan layout and sizing for future activated sludge
<br />secondary treatment to replace existing lagoons.
<br />• Provided the process engineering for design and construction documents for a lime slurry storage
<br />and feed system for sludge conditioning prior to filter press dewatering at the waste management
<br />CID biological treatment facility in Calumet City, Illinois. Worked on a 6,000-gallon storage tank,
<br />lime slurry mixer, transfer pump, transfer piping, and sludge day tank modifications.
<br />• Managed activities at industrial wastewater pretreatment facilities in Cleveland, Ohio, to meet
<br />copper, lead, and zinc discharge limitations. Developed contract documents and construction
<br />services for the 1,000-gpm pretreatment and sludge handling facilities.
<br />• Managed the preliminary design, plans, and specifications, for a project in Cleveland, Ohio, to
<br />reuse up to 800 gpm of industrial treatment plant effluent for cooling water in the plant by
<br />providing pH adjustment, cooling, storage, and pumping facilities.
<br />• Served as project manager for an open-channel hydraulics study of flow in the melting area sluice
<br />of a plant in Cleveland, Ohio, to minimize flooding of the melt area floor. Prepared plans and
<br />specifications for recommended improvements to 3-mgd submersible pumping stations and force