Laserfiche WebLink
Council Minutes of 11/20/90 <br />b. The proposal to construct an addition to Suburban Auto Body, 49b0 <br />Dover Center Road, was discussed. Mr. Angelo Papato and Kevin Kanerik <br />were in attendance. This addition will improve circulation within the <br />shop, will contain some indoor parking, and will clean up the rear of <br />the property. Also, the existing driveway will be removed. The <br />material to be used will match the existing with dryvit on the Mill Road <br />elevation and intricately colored 8-inch block will be used on the rear. <br />The material on the sight-line drawings are all approved. The proposal <br />was approved by Planning Commission, ARB, arxi BZD. Moved to approve <br />with the recommendations of Planning Commission and ARB; second by Mr. <br />Tallon; passed unanimously. <br />c. Mr. Russ and Mr. Butchko were in attendance representing Nutron <br />Nameplate at 31269 Lorain Road. This is a proposal to construct an <br />addition for manufacturing and office space. Tt has been approved by <br />Planning Commission and ARB. The information was submitted to BZD in <br />regard to storage and disposal of hazardous waste. The Committee had no <br />objections. Moved to approve with the recommendations of Plarming <br />Commission and ARB and also with the approval of the Engineering Dept.; <br />second by Mr. McKay; passed unanimously. <br />d. The proposal to construct a 1,000 sq. foot addition to the North <br />Olmsted Home Care Center at 29794 Lorain Road was discussed. Mr. Steven <br />Schill presented drawings. Aside yard variance has been granted by <br />BZA. Proposal was approved. by Planning Commission and ARB; BZD <br />Committee had ~ objections. Mowed to approve the special permit <br />granted by the BZA Committee and the proposal. with the recommendations <br />of ARB and Planning Commission; second by Mr. Tallon; passed <br />unanimously. <br />e. Chand Building, 30033 Lorain Road, proposal to construct an <br />office building. Mr. Dan Margulies, Project Designer; Stuart Syler, <br />Engineer; and Mr. Chand presented the plans. Also, Mrs. Benedict, a <br />neighbor was in attendance. The proposal is far a 14,000 sq. ft. office <br />building,. which was approved by Planning Commission subject to <br />recommendations of ARB and the Engineer. The Engineering Dept. should <br />study the drainage situation with the possibility of a lift station <br />being constructed. The BZD Committee recommended a cut in the lights. <br />Moved to approve with the recommendations of Planning, ARB, and the BZD <br />Committee that the lights be shielded and the complete engineering plans <br />are approved and reviewed by Council; second by Mr. Tallon; passed <br />unanimously. <br />f. Metro Lexus, 28450 Lorain Road, request to change the previously <br />approved addition by approximately 600 feet. Mr. Stoyanov, the <br />developer, explained the plans. This has been approved by Planning <br />Commission; also, the Assistant Fire Chief has been contacted in regard <br />to moving the fire hydrant. BZD Committee had no objection. Moved to <br />approve with the recommendations of Planning Commission anti the Fire <br />Chief; second by Mr. O'Grady; passed unanimously. <br />3 <br />~: <br />