My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/03/2003 Meeting Minutes
Document-Host
>
City North Olmsted
>
Minutes
>
2003
>
06/03/2003 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 8:46:19 AM
Creation date
1/13/2014 4:00:53 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Date
6/3/2003
Year
2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Council Minutes of 6/3/2003 <br />may be included. This would possibly be at no cost to the city. The Safety Dept. will <br />look into this possibility. <br />A liquor permit request by Chipotle Mexican Grill, which was addressed by Councilman <br />Miller at the last Council meeting. <br />2) An additional Safety Committee meeting was held on Tuesday, May 27, to address a new <br />D1 liquor permit for Chuck E. Cheese at 26104 Great Northern Blvd. This was discussed <br />with no objection from the Police Dept. Councilwoman Kasler moved that Council have no <br />objection to the liquor permit for Chuck E. Cheese. The motion was seconded by <br />Councilman Nashar and passed unanimously. <br />Councilman Miller, chairperson of the Intra-Govemmental Relations and Legislation; Long- <br />Range Planning Committee: 1) The committee met on June 2. Present were committee <br />members Kasler and Miller. Mr. Gareau was excused as was attending a Recreation <br />Commission meeting which had been previously scheduled. Also present were Councilman <br />Nashar and Law Director Dubelko. The following items were discussed: <br />An update on the status of the library construction as a result of questions that Mr. Nashar <br />had brought forth as well as observations of several Council people. Mr. George Daily, <br />the library construction manager, explained that 100% of the first floor foundation is in <br />and that 85% of the basement walls aze poured. In his words, he is "tickled" with the <br />progress considering the weather. He indicated that he had lost no construction days due <br />to the weather in spite of all the rain. He explained, as a result of questions about how <br />much work is really getting done there and aze the crews really there, that it is tight <br />quarters in a basement area such as this, and oftentimes, when the workers are actually <br />belaw ground, there is the perception that there's not much going on. Actually as much as <br />can be done given the site size is being done, and the construction is going forward. He <br />maintains that he is on schedule and in some cases possibly a little bit ahead of schedule. <br />The steel structure that was targeted to go in on June 24 or 25 may go in as early as <br />between June 9 to the 16. When that happens, more activity will be evident. There were <br />numerous questions about water issues on the site. Mr. Daily repeatedly indicated the <br />library is not built on a spring; however, there is filtration water that is gathering at the <br />basement floor level and even into the area that will hold the foundation or the well site <br />for the elevator. Mr. Daily indicated there are two sump pump sites at the location that <br />are now being powered by portable generators and the amount of water being pumped <br />would be approximately similar to that of a garden hose. This is a concern because Mr. <br />Miller's own observations and of other Council members is that what is being used is <br />something similar in texture and style to a fire hose, probably 3 inches wide. There is a <br />significant difference in that which comes out of a small garden hose and that of <br />something nearly a fire hose. Again, the committee was assured that it is not a spring, but <br />rather filtration and that the floor of the library is being built below the water table. <br />Subsequently, the water is pooling in the basement area and the exterior walls at the floor <br />level and below the floor level where the sump pump sites exist now and the water is <br />being pumped out from there. Mr. Miller observed the water to be crystal clear and <br />coming out at quite a high rate. If the pumps are left on (according to the plans, there <br />will be two sump pump sites at the new library when completed), these pumps will <br />eventually drain off the sub-ground water in, Mr. Daily's words, "a pazabolic design." In <br />other words, the dryer ground will be closer to the sump pump because that is where the <br />9 <br />L <br />
The URL can be used to link to this page
Your browser does not support the video tag.