Laserfiche WebLink
<br />Ms. Becker <br />Page Two <br />~fl <br />November 20, 2003 <br />23. Catch basin and manhole details -are included. Retention system details will <br />be provided. <br />24. Landscape mounds will be added to the grading plan as necessary. <br />25. The provided notes have been added to the plans. <br />26. A preliminary erosion control plan is included. <br />As noted above, several items will be addressed in the next plan submission. <br />Please do not hesitate to contact me if you have any questions. <br />Respectfully submitted, <br />Chagrin Valley Engineering, Ltd. <br />1 <br />1 <br />Donald P. Bierut, PE <br />~~~~~~ D <br />~~ <br />I~C~~ ~ ~ '~Q~ <br />NC?RTFf ~'~,MaT'~'D <br />BUtI,AINCa QEpT <br />