My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-096 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2001
>
2001-096 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 10:57:06 AM
Creation date
1/15/2014 10:01:11 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2001-096
Legislation Date
7/18/2001
Year
2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Specifications <br />provided with the completed apparatus. <br />DETAILED APPROVAL PRINT. PUMP OPERATOR'S PANEL <br />A detailed drawing, to scale, of the pump operator's panel shall be provided for approval prior <br />to construction. This drawing shall include all of the gauges and controls located on the puinp <br />operators paneL The pump panel shall match the size and layout of existing Fire Department <br />pumpers. MANI)ATORY OPERATIONAL REQUIREMENT <br />TtiRNING RADIUS AND REPORT <br />The turnin'g cramp angle shall be 45 degrees or greater. A computer print out showing both <br />curb to curb and wall to wall turn radius reports for inside and outside tire and bumper ares is <br />required with the bid. <br />No1-th Olmsted has many roads with limited access private drives and small turnarounds. A <br />45 degree or a-Teater cramp anQle is a MANI)ATORY OPEI2ATIOlVAL REQUIREMEIlTT <br />to assure that the apparatus will be able to maneuver in these areas. <br />STEERING CRAMP ANGLE CERTIFICATIQN <br />The chassis shall have a ininimum 45 degree cramp angle both Ieft and right with the <br />specified 18,7401b. front axle and 385 fronf tires. <br />The fire apparatus manufacturer shall provide, at time of bid, a letter from an independent <br />third party testing agency stating they certify and approve th-, steering cramp angle at a <br />minimum of 45 deQrees. MANDATORY OPERATIONAL REQUIREMENT <br />INF4RNIATION REQUIREB <br />The manufacturer shall supply at time of delivery, complete operation and maintenance <br />manuals covering the completed apparatus as delivered. A pei-manent plate shall be mounted <br />in the driver's compartment which specifies the quautity and type of fluids required including <br />enQine oil, engine coolant, transmission, pump transmission lubrication, pump primer and <br />drive axie. <br />PERFORMANCE TESTS AND REQUIREMENTS <br />A road test shall be conducted with the apparatus fully loaded and a coiltuluous 1-un of ten (10) <br />miles or more shall be made under all driving conditions, during which time the apparaius <br />shall show no loss of power or overheating: The transmission drive snaft or shafts, and rear <br />axles shall run quietly and be free from abnormal vibration or noise throughout the operatina <br />range of the apparatus. Vehicle shall adhere to the followincy parameters: <br />A) The apparatus, when fully equipped and loaded, shall have not less than 25% nor <br />more than 50% of the weight on the front axle, and not less than 50% nor more than <br />75% on the rear axle. <br />B) The apparatus shall be capable of accelerating to 35 mph from a standing start within <br />25 seconds on a level concrete highway without exceeding, the maximuin governed rpm <br />Bidder <br />Compiies <br />1%es I No <br />Paae 6
The URL can be used to link to this page
Your browser does not support the video tag.