Laserfiche WebLink
Page 4 of 5 <br />(b) All lettering on the plan and detail sheets is to be done with drafting standards <br />acceptable to the City. Drawings shall include a title sheet, general notes, plan <br />sheets, and detail sheets. <br />(c) Work shall be coordinated with utility companies as necessary. The City <br />Engineer shall be copied in all correspondence to utility companies. <br />(d) All plans will be reviewed by the City. 5ubmit two (2) interim copies of the <br />plans and specifications for review. A11 construction documents must comply <br />with Ohio Basic Building Code. <br />5. Detaiied Desiizn Document Services• <br />(a) Preparation of design drawings, technical specifications and bid form for use in <br />bidding and construction. The specifications will be incorporated by the City <br />into a project manual which shall also include the advertisement, instruction to <br />bidders, general conditions, bid forms, bond requirements, prevailing wage <br />rates, affidavits, and other miscellaneous forms required for a bidding docu- <br />ment. Final pIans and specifications shall incorporate all changes required in <br />review of preliminary or intermediate plans. <br />(b) All design drawings may be done using an electronic program which is com- <br />patible with the AutoCAD V Version 12 program. If done electronically, a <br />diskette or diskettes, if necessary, formatted in AutoCA.DO Version 12 contain- <br />ing a file for each final design drawing prepared during the project shall be <br />submitted to the City. A diskette or diskettes prepared in Microsoft Word of <br />the technical specifications must be submitted to the City. <br />(c) One set of plans, specifications and bid form shall be furnished to the City <br />for each bid package for bidding purposes. <br />(d) An opinion of probable costs for each bid package, broken down into major <br />components, shall be submitted prior to bidding. <br />(e) The design professional or his representative shall be available to answer ques- <br />tions regarding plans intent during bidding and construction. Attendance at <br />a pre-construction meeting is expected. <br />(f) A minimum of five (5) site visits aze to be included in the scope of work for the <br />construction phase. Preparation of a punch list shall be included in this phase of <br />the work.