Laserfiche WebLink
<br /> <br /> <br />? Page OW <br />! <br />• provisions for three lanes of traffic in each direction throughout construction <br />• phase construction plans, showing use of new concrete shoulders <br />• mairn,enazice of traffic on ramps, arxi weaving of exit and etrtrance tamps into mainlitte <br />traffic <br />• detaiLs to show ta{er lengths and locations of signs and separators. The taper lengtbs <br />varied at each imerchange, because the exit and entranae ramps are so close to each <br />other <br />3) T'raffiic Control: <br />• sign replacement and upgrading to meet currern standards <br />• guide signs <br />• regulatory signs <br />• warning signs <br />• route markers <br />• checking structural adequacy of existing sign supports to use with new signs <br />• upgr" sign lighting <br />• preservation of required verticai clearance <br />• temporary and permanent pavement markings <br />4) Bridge Repair: <br />• concrete repairs and sealing at superstructure and substructure, and instailation of a <br />new wearing course <br />• deck bottom sounding <br />• sealing traverse expansion joints <br />• slope repair and protection <br />• drainage cleaning repair of retrofit <br />• cortection of sidewalk settfemern at underpasses <br />• stcuctural sted repair <br />Z'he final drawings included: <br />Rosdway Plans <br />Maintenance of Traffic Plans <br />Traffic Cornrol Plans <br />Bridge Repair Plans <br />Specifications and final construction cost estimates were prepanxi and subnutied with the fuial <br />drawings. <br />