My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
92-035 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1992
>
92-035 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2014 12:16:38 PM
Creation date
1/17/2014 7:44:38 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
92-035
Legislation Date
5/5/1992
Year
1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MALCOW Section 2 <br />IRNI Project Approach <br />This base map would usable for not only the purposes of the present <br />NPDES stormwater permit application but also for the other WWTP <br />site work including any design work which may result form the ongo- <br />ing North Olmsted WWTP Facilities Plan Update. Approaching the <br />project in this manner will allow the City to obtain maximum utility <br />from the stormwater discharge permit application. <br />2) Present the existing drainage information within one quarter mile of <br />the WWTP site using the most recent Cuyahoga County Orthophotos <br />having one foot contour lines. Four orthophotos will be required. <br />This approach greatly minimizes the costs of the aerial photography <br />and ground control points surveying. <br />3) Use of the personnel and laboratory facilities of the WWTP to un- <br />dertake to collect and analyze the required stormwater sample. <br />Malcolm Pirnie will lease, install and calibrate the flow monitor, <br />sampler and raingauge for the one storm event. By utilizing the City <br />personnel to perform the physical collection and by utilizing the <br />WWTP laboratory and the existing conservative pollutant parameters <br />laboratory contract to complete the analytical work, the cost of hav- <br />ing Malcolm Pirnie mobilize to collect the sample and the cost of <br />analysis by an external laboratory will be etiminated. <br />4) Analyze and assemble the data base for inclusion in the stormwater <br />discharge permit in such a manner that any future construction pro- <br />jects at the WWTP site can be easily analyzed. Future construction <br />projects will have to be preceded by requesting some stormwater <br />impact analysis appcovals from the Ohio EPA which are not present- <br />ly required as part of the Ohio EPA construction permitting proce- <br />dures. <br />Scope of Services <br />To accomplish the Project Approach, Malcolm Pirnie will perform the <br />following tasks: <br />Task 100 - Project Planniniz, Management and Qualitv Assurance⢠<br />Malcolm Pirnie will obtain the necessary NPDES permit application <br />forms for filing with the Ohio EPA, and arrange the planning of the <br />project such that the application and its supporting documentation <br />can be submitted to the Ohio EPA by the City of North Olmsted by <br />the October 1, 1992 regulatory deadline. <br />M-30261.11/CLG <br />Cunlidcniml 13usincss Information <br />Nonlr Olntsted 6VW"I'P Slomztivater NPDES Pemiit Applicatlon / 2-3 <br />RLCYCLLDPAPER
The URL can be used to link to this page
Your browser does not support the video tag.