Laserfiche WebLink
r ? <br />?..??,. <br />g. An electrical plant proof-of-performance test shail be compieted at <br />no less tlian (15) different Subscribe?s netwoek iiistributi0n" locations in the system. The locations selected shall be different <br />from those locations used in the physical plant inspection required <br />withing subsection 2,C. If the opinion of the independent <br />consultant, if one is engaged, fifteen (15) test points per system is <br />not sufficient to collect enough data to be considered reliable data, _ <br />the independent consultant shall reserve the right to require a <br />reasonable number of additional tests as determined necessary to <br />insure the collection of sufficient data. <br />h. The GRANTEE shall connect the Subscriber tap or service output <br />to the proper test equipment impact via a 100' swept RG-59, RG56 <br />or such other Subscriber drop cable or the length of cable specified <br />in the FCC rules. This procedure is to simulate and document the <br />actual signal levels provided to typical Subscribers. The procedure is to <br />be performed at a minimum of 25 different locations throughout the <br />service area. <br />i. The following test shall be performed by the GRANTEE with the <br />participation of the independent consultant, if one is engaged by <br />the City at each of the aforementioned test points for the purpose <br />of evaluating the technical performance of the system in an <br />objective manner. <br />1. Visual (Picture) carrier levels on activated channels. <br />2. Aural (Sound) carrier levels on activated channels. <br />3. Peak-to Valley on the entire land of activated channels (Sweep <br />• Response Test). <br />4. Highest to lowest video carrier difference (calculafed) on the <br />entire land of activated channels. <br />5. Carrier-to-Noise ration measurement.