Laserfiche WebLink
Council Minutes of 02-18-2014 <br /> • Discussed first was Resolution 2014-10, which is a Resolution dispensing with <br /> the RFP process and authorizing the Mayor to enter into a contract with Cuyahoga <br /> County/Cuyahoga County Engineer for the purpose of providing inspection <br /> services for bridges and culverts. Planning Director Wenger stated the City has <br /> contracted with the County engineer since 2010 to perform required inspection of <br /> bridges and culverts. State and federal requirements provide the inspection of the <br /> bridges on an annual basis to rate our structures and identify required maintenance <br /> and capital improvements. The contract proposal for this year is $5900. A <br /> motion was made to recommend to approval of Resolution 2014-10, and the <br /> motion passed 3-0. <br /> • Discussed next was Resolution 2014-11 which is a Resolution authorizing the <br /> Director of Public Service/Mayor to advertise for bids for the award of a contract <br /> to provide cracksealing on various streets at various locations in the City, as <br /> detailed in the specifications on file in the Service Department, and authorizing <br /> the mayor, following approval of the Board of Control, to contact for the same <br /> with the lowest and best bidder, and declaring an emergency. Service Director <br /> Glauner stated the City would like to bid approximately 60,000 pounds of <br /> cracksealing by an outside contractor. The estimated cost of this project would be <br /> approximately $8000. The primary focus would be Lorain Road from Canterbury <br /> to Stearns. A motion was made to recommend to approval of Resolution 2014- <br /> 11, and the motion passed 3-0. <br /> • Discussed next was Resolution 2014-12, which is a Resolution authorizing the <br /> Director of Public Service/Mayor to advertise for bids for the award of a contract <br /> to provide new pavement markings to various streets at various locations in the <br /> City, as detailed in the specifications on file in the Service Department, and <br /> authorizing the Mayor, following approval of the Board of Control to contract for <br /> the same with the lowest and best bidder, and declaring an emergency. Service <br /> Director Glauner requested to go to bid for street striping throughout the City. In <br /> 2011, the City did the center lines and some turn lanes and curb lines. This <br /> particular project will cover the remaining areas with the exception of those areas <br /> that will be resurfaced as those projects have the striping included. The cost is <br /> approximately $110,000. A motion was made to recommend to approval of <br /> Resolution 2014-12, and the motion passed 3-0. <br /> • Discussed last was Resolution 2014-13 which is a Resolution authorizing the <br /> Director of Public Service/Mayor to advertise for bids for the award of a contract <br /> to provide asphalt resurfacing and related repairs upon City streets, as detailed in <br /> the specifications on file with the engineer, and authorizing the Mayor, following <br /> approval of the Board of Control, to contract for the same with the lowest and best <br /> bidder, and declaring an emergency. Service Director Glauner requested to bid <br /> for the asphalt resurfacing and curb work for various areas in the City. There are <br /> three streets that need immediate repair which are Dorchester, Mitchell and <br /> Randall. There will be an asphalt overlay on these streets. In addition, Walter <br /> Road will be resurfaced between Lorain and Gessner. The approximate cost is <br /> $390,000. A motion was made to recommend to approval of Resolution 2014-13, <br /> and the motion passed 3-0. The meeting was adjourned at 7:50 p.m. <br /> 4 <br />