My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-121 Ordinance
Document-Host
>
City North Olmsted
>
Minutes
>
2023
>
2023-121 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2024 10:42:46 AM
Creation date
9/19/2024 9:52:29 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2023-121
Legislation Date
9/17/2024
Year
2023
Legislation Title
Lorain Road Corridor Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Cuyahoga County Greenways plan explored <br />connected bike networks throughout the county, <br />and provides the basis for a comprehensive bike <br />network for the City of North Olmsted. <br />Four types of paths have been identified <br />to connect riders to existing trails and key <br />destinations. <br />• COMMUNITY CONNECTOR paths are <br />designed to link key civic, educational and <br />other assets via a safe, off-road option. These <br />are envisioned to support safe routes to <br />school. <br />LORAIN MULTI -USE CONNECTOR is the <br />multi -use path envisioned for the Lorain <br />Road corridor to accommodate expanded <br />pedestrian use and safer bike access. <br />T <br />RECREATIONAL LOOP AND METROPARKS <br />CONNECTOR will serve as a continuous <br />Vail for residents of North Olmsted to enjoy <br />trekking within their city to nearby Cleveland <br />Metroparks and other recreational assets. <br />REGIONAL CONNECTOR paths provide access <br />to surrounding communities and additional <br />recreational assets in Cuyahoga County. <br />These paths are envisioned to work together <br />to create a comprehensive approach to non - <br />motorized community connections. The path <br />sections can be completed in phases and should <br />seek to build from existing infrastructure for <br />maximum impact. <br />CITY OF NORTH OLMSTED I CITY ARCHITECTURE I WSP 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.