My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-121 Ordinance
Document-Host
>
City North Olmsted
>
Minutes
>
2023
>
2023-121 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2024 10:42:46 AM
Creation date
9/19/2024 9:52:29 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2023-121
Legislation Date
9/17/2024
Year
2023
Legislation Title
Lorain Road Corridor Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLAGUE ROAD INTERSECTION: GATEWA' <br />C(ague Road is currently a high volume <br />intersection along the Lorain Road corridor as it <br />connects to 1-480. This is the easternmost major <br />intersection for Lorain Road in the city of North <br />Olmsted so it serves as one of the first impressions <br />for North Olmsted to anyone entering the City <br />from the east and south. Traffic volumes and <br />auto -dominated uses around the intersection <br />prioritize vehicular access and movement. Despite <br />its challenging pedestrian environment, many still <br />use the corridor (and intersection) for recreational <br />walking and biking. <br />Recommendations focus on right -sizing the north/ <br />south approaches to the intersection, a reduction <br />in curb cuts, pedestrian and bicycle improvements <br />and the development of public art, branding and <br />placemaking details to support this area's role as a <br />gateway to the city. <br />PRIORITIES <br />• Trailhead transit stop <br />• Green frontage enhancements at vacant <br />parcel and flooring store <br />• Street trees <br />• New branded North Olmsted signage <br />• Mixed-use redevelopment at former <br />garden center site <br />• High visibility crosswalks <br />• Removal of excess receiving lanes on <br />Clague Road <br />• Medians on Lorain Road near <br />intersection <br />• Reduction/removal of excess curb cuts <br />at intersection <br />. FRONTAGE STANDARDS <br />ENHANCED TRANSIT AMENITIES <br />TRAILHEAD-THEMED TRANSIT STOP <br />0 MEDIAN <br />® REDEVELOPMENT OPPORTUNITY <br />C1 INTERSECTION REALIGNMENT <br />LORAIN ROAD CORRIDOR STUDY <br />
The URL can be used to link to this page
Your browser does not support the video tag.